













1. Preparation: The installation team will come to the house and take pictures of the entire space to track the job from start to finish.
2. Door/Drawer Removal: The installation team place drop cloths over the space to protect the entire area during the process of removing all the hardware, doors and drawer fronts.
3. Deliver To Factory: The factory is temperature controlled and dust-free, which allows for a precise finish. The latest technology is used to apply a superior finish.
4. Protection: You can leave items in your cabinets!
5. Contain: Everything is covered with paper masking or plastic. We put up telescopic poles with plastic to wall-off the area to be painted. An air mover is used to exhaust the air.
6. Apply: Our 7 Point process is applied to the boxes and molding in the home.
A NEW kitchen in just 3 days!
12 Months No Payments
12 Months No Interest
+
12 Months No Interest No Payments